Concrete Platform

This platform is situated adjacent to the famous Blue Lagoon Bay in Comino, in shallow water of around 2.5 meters depth. Works consisted of trimming excess concrete, loading MV Gold Dredger and disposal. We then leveled the seabed using a grab and installed the shuttering with the assistance of commercial divers. Shuttering was reinforced by means of blocks. The steel reinforcement was lowered in position and concrete was casted through appropriate chutes.